Phase 3 of the construction of Nõo Lihatööstus (Nõo Meat Industry)

In phase 3 of the construction works, an extension will be added to the existing building, partially on the existing building, and a separate 2-storey crate washing building will be added. The 1-storey extension with a dark façade, assembled reinforced concrete structure and metal roof trusses will provide a contrast to the white walls and wide red eaves of the previous extensions.
The extension will house raw material reception, raw material warehouses and the meat cutting department. The gable roof of the existing building will be replaced with a flat roof of the added level. The rooms on the first floor will be rebuilt into technical rooms.

Net area: 1024,5 m²
Expected construction period: июнь 2016-январь 2017
Project designer: Projekt O2 OÜ, designer Kalli Metspalu